San Luis Renewables Partnership
2022 - ongoing
OurEnergy partnered with SLR for a project on a total approximate area: 2,700 Acres. Right to develop on 1200 acres of U.S Bureau of Reclamation Land
Solar and Energy Storage Capacity: 300MW+
Proximity to Grid/Gas Infrastructure and water access for Electrolysis - plan and pathway to green H2 and derivatives development.
Conveniently located adjacent to I-5 and HWY 152. The location will cater to future H2 and EV trucks.
Distribution to H2 fueling station network
Project located in the middle of an agricultural area. There is a large fertilizer demand and the land is connected by roads and rail to Stockton.
There is an existing permit to develop and interconnect 25 MW of solar and energy storage on USBR land
Environmental survey/permitting work for additional Solar & H2 facilities underway.